看诗词>英语词典>railroad line翻译和用法

railroad line

英 [ˈreɪlrəʊd laɪn]

美 [ˈreɪlroʊd laɪn]

网络  铁路线

英英释义

noun

双语例句

  • Engineering Plan of Soil and Water Conservation for Construction of Railroad Special Line of Tuo Electric Power A
    托电A厂铁路专用线水保方案工程措施设计
  • Digital Railroad Passenger Dedicated Line AT Power Supply System Modeling and Simulation
    数字化铁道客运专线AT供电系统空载建模与仿真
  • "Special-purpose Railroad Production scheduling Direction Management information system" aims at the multi-systems integration storage and transport work which the enterprise railroad private line transportation work the modernization develops to produce the platform.
    《专用铁路生产调度指挥管理信息系统》是针对企业铁路专线运输作业的现代化建设而开发的多系统一体化储运生产作业平台。
  • The Promise County, west Beijing, Shenzhen Expressway and Jing-Guang Railroad traffic of the two main artery, Highway south Shi Huang, Rao is the territory and had to wear line;
    无极县西临京深高速公路和京广铁路两条交通大动脉,南临石黄高速公路,正饶线穿境而过;
  • The article further launches the railway transportation special line route selection design research in Guangzhou Shenzhen and Hongkong and proposes the high-speed railroad passenger transportation special line and route line design proposal.
    在此基础上,展开广深港铁路客运专线选线规划设计研究,优化提出高速铁路客运专线选择线路规划设计建议。
  • Using network technology, computer technology, single chip technology, transducer technique and CAN bus, real-time monitoring of railroad signal equipment of petrochemical special line was realized, facilitating condition-based repair of signal equipment.
    利用网络技术、计算机技术、单片机技术、传感器技术和CAN总线方式,实现对石化专用线铁路信号设备的实时监测,为专用线信号设备实现状态修创造条件。
  • Connecting with the concrete examples, this paper expounds the construction scheme for the railroad switch squaring in the platform on the jointless line, which is the effective path and method for the displacement of the railroad switches.
    结合具体实例阐述了无缝线路站区道岔拉方的施工方案,该方案是解决无缝线路道岔爬行有效的途径和方法。
  • Up to at present, the financing channel for the railroad new line construction extremely was unitary, but also did not have to bring into market operation officially. But this tendency was inevitable.
    截至目前,铁路新线建设的融资渠道仍然十分单一,还没有正式纳入市场运作,但是相信这一趋势是必然的,所以本文的基础研究是在市场化这一前瞻性假设下来讨论的。
  • The railroad line design is one part of the entire railroad construction, further more, the design method being correct or not and the design quality being good or poor are of the pivotal significance to the cost of the railroad project.
    其中,铁路线路设计工作是在整个铁路建设中的一个环节,设计方法的正确与否和设计质量的好坏对铁路工程造价的高低具有举足轻重的意义。
  • Research on the construction methods of the hydraulic tunnel under the present railroad line
    既有铁路线下水工隧洞的施工技术研究